Home > Events > More upper BST corridor clearing

More upper BST corridor clearing

10/21/2023, 10:00 am -  3:00 pm
Work Parties
Bob Bournique
15
Cascades to Sound, Central, Kittitas
Registration is closed

More Upper BST trail corridor clearing off the West Fork Teanaway in the TCF. Meeting at 10 a.m. at the gate at the end of the West Fork road past the campground to drive up. Bring saws, pole saws, loppers, etc. Secondary crew possibly doing existing trail tread work and cutting ramdom roots, etc. If we have enough people. Hoping to stay ahead of the start for Tamarack Trail Building and the mini-X in creating trail grade finally. This will be the first legit Towns to Teanaway connection and will eliminate the Big Sandy Road climb (Road to Rotich on Trailforks) that many have endured to get out of the valley back to Cle Elum Ridge. Approximately 4.5 miles in length and open to all non-motorized use. We are finally over half way and can still use some help while the weather holds out.  e-mail for d-tail at bbtcrides at frontier dot com.