Japanese Gulch Zorro Bridge Rebuild Work Party #1
We have a permit to rebuild the defunct bridge on zorro at the north end of the gulch. We have a lot of materials to
Move in. This event will be to haul most of those materials in and do some site prep. We really need help with this one. Hope you can make time to come out.
We are going to meet at the Tails and trails Dog park at 1301 5th St, Mukilteo, WA 98275.