BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//jEvents 2.0 for Joomla//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:STANDARD
DTSTART:20251102T010000
RDATE:20260308T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:America/Los_Angeles PST
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250803T090000
RDATE:20251102T010000
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:America/Los_Angeles PDT
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:f7923d5db401cc904b2558923070a051
CATEGORIES:Work Parties
CREATED:20260730T123553
SUMMARY:Trail C Raging River New Build
LOCATION:Raging River
URL;VALUE=URI:https://www.evergreenmtb.org/calendar/eventdetail/26298/trail-c-raging-rive
 r-new-build?tmpl=component
DESCRIPTION:Click the following link for the latest event details: https://www.evergree
 nmtb.org/calendar/eventdetail/26298/trail-c-raging-river-new-build\n\nTrail
  C Needs You! 🚧\n
Another new trail has been in the works at Raging River. 
 Trail C is a new machine built trail with a nice mix of built up shapes ble
 nded with technical features and tighter routing. Located deeper within the
  trail system this new trail will open up numerous new loop options. \n
Thi
 s is where YOU come in 👇\nWork still remains to get this project across the
  finish line. Having compacted and seasoned over winter there is some storm
 /water damage to contend with. A variety of tasks remain to give this trail
  the final touch before opening. \n
⏰9am - 2pm\n
📍Meet at the Yellow Gate o
 n Winery Rd. We will shuttle to the work location once everyone is loaded u
 p. Please arrive early enough so you are ready to head to the worksite by 9
 :00am.\n
Whether you’re a seasoned digger or brand new to trail work, there
 ’s a place for you out here. Come be part of building something the whole c
 ommunity will ride and love for years to come.\n
We bring all the tools nee
 ded and all the knowledge to get you going. We recommend bringing work glov
 es, sturdy shoes, water and snacks to keep you comfortable. Bring your bike
  for a lap after work is complete for the day. (Heres your opportunity to r
 ide a brand new trail)\n
Text/Call Trail Builder Michael w questions: 415-6
 81-5107\n
X-ALT-DESC;FMTTYPE=text/html:Click the following link for the latest event details: https://www.evergree
 nmtb.org/calendar/eventdetail/26298/trail-c-raging-river-new-build\n\n<p><s
 trong>Trail C Needs You!</strong> 🚧</p><p>Another new trail has been in the
  works at Raging River. Trail C is a new machine built trail with a nice mi
 x of built up shapes blended with technical features and tighter routing. L
 ocated deeper within the trail system this new trail will open up numerous 
 new loop options. </p><p>This is where YOU come in 👇<br />Work still remain
 s to get this project across the finish line. Having compacted and seasoned
  over winter there is some storm/water damage to contend with. A variety of
  tasks remain to give this trail the final touch before opening. </p><p>⏰9a
 m - 2pm</p><p>📍Meet at the Yellow Gate on Winery Rd. We will shuttle to the
  work location once everyone is loaded up. Please arrive early enough so yo
 u are ready to head to the worksite by 9:00am.</p><p>Whether you’re a seaso
 ned digger or brand new to trail work, there’s a place for you out here. Co
 me be part of building something the whole community will ride and love for
  years to come.</p><p>We bring all the tools needed and all the knowledge t
 o get you going. We recommend bringing work gloves, sturdy shoes, water and
  snacks to keep you comfortable. Bring your bike for a lap after work is co
 mplete for the day. (Heres your opportunity to ride a brand new trail)</p><
 p>Text/Call Trail Builder Michael w questions: 415-681-5107</p>
DTSTAMP:20260730T213112
DTSTART;TZID=America/Los_Angeles:20260804T090000
DTEND;TZID=America/Los_Angeles:20260804T140000
SEQUENCE:0
TRANSP:OPAQUE
END:VEVENT
END:VCALENDAR